Commercial property · Benidorm
Commercial Rooftop Solar
A commercial rooftop installation in Benidorm: an array sized on measured daytime demand, minimal roof penetrations, monitoring, and capacity reserved for EV charging.
Property type
Commercial building, in use throughout
Location
Benidorm, Costa Blanca
Installation type
Rooftop solar, commercial
System scope
Solar array, daytime load optimisation, monitoring, EV charging preparation
Project stage
Completed and commissioned
Key design consideration
Roof plant and access routes reduced the usable surface considerably
Project intro
A working building that could not close
The property is a commercial building in Benidorm, occupied and trading throughout the project, with a flat roof already carrying air conditioning plant.
The brief was to cover as much of the daytime load as the roof sensibly allowed, without interrupting the business for longer than a single agreed window.
Operational context
Demand that follows the sun
Consumption data showed a load concentrated firmly in business hours, with air conditioning lifting the middle of the day through the warmer months.
That profile lines up closely with the generation curve, which made a straightforward self-consumption system the obvious design and put storage well down the list.
Roof and electrical assessment
Less usable roof than the plan suggested
The survey found that existing plant, maintenance walkways and the safety zone around the roof edge removed a substantial part of the surface a roof plan would appear to offer.
On the electrical side there was capacity to work with, but the distribution board had little room left, so the connection point had to be planned rather than assumed.
System design
Sized against the base load
The array was sized so that generation is absorbed by the building under normal trading conditions rather than exported, which meant deliberately not filling every remaining square metre.
Ballasted mounting was selected to suit the flat roof and its covering, keeping penetrations to a minimum and leaving the existing roof warranty intact.
- Array laid out around plant, walkways and the roof edge zone
- Sized on measured daytime consumption, not on maximum roof area
- Mounting chosen to limit roof penetrations
- Connection point planned around the existing distribution board
Installation planning
One window, agreed in advance
Roof work, mounting and cabling were carried out during trading hours without affecting the business, since none of it required the supply to be interrupted.
The connection itself was completed in a single planned interruption outside opening hours, agreed with the building manager and confirmed the week before.
Monitoring
Reporting for whoever is on duty
Monitoring shows generation alongside building consumption, so the two can be read against each other rather than in isolation.
Access was set up for the building manager rather than only for the installer, which is what makes an unexpected change likely to be noticed.
Future EV charging preparation
Prepared, not installed
The business expects to add charge points for staff and visitors, so the electrical design reserves capacity and containment for them now.
Nothing was installed at this stage. What was done is the part that is expensive to add later: the route, the space in the board and the capacity held back for it.
Result
A system matched to how the building runs
The installation supplies a working building whose demand sits in the same hours as its generation, which is the condition under which rooftop solar is most straightforward.
The building manager can see what the system is doing, and the next phase has somewhere to connect to.
- Generation matched to the building's own daytime demand
- Monitoring available to the person responsible for the building
- Capacity and containment reserved for charge points
- Roof penetrations minimised and documented
Gallery
Roof, structure and installation



About these images
Solara Energy is a fictional company created for a portfolio demonstration. The photographs shown here are stock images that illustrate the type of work described, not records of this project.
Related services
The parts of this project, explained in full.
Commercial
Commercial Solar
How a commercial system is assessed from the load profile, and what a business should bring to the first conversation.
Charging
EV Charging
Workplace charging, load management, and why reserving capacity is the part that has to happen early.
Process
How we work
The eight stages from first consultation to handover, and what each one produces.
Next step
A commercial roof and a year of consumption data.
That is usually all we need to say something useful about whether solar suits your building.