Assessment request

Tell us about the property.

A useful solar assessment starts with the property, current energy use and what you want the system to do.

The form below covers what we need to give you a first answer that is worth having. Nothing on it commits you to anything.

01

What happens next

We read the request and come back with what looks realistic on that property, or with the questions we would need answered first.

02

What we do not need yet

No documents, no bills, no plans. If a site visit follows, that is the point at which detailed information becomes useful.

03

What this is not

This is a portfolio demonstration for a fictional company. No appointment is made and no proposal is produced.

The property

Assessment request

Everything marked optional can be left blank. The more you can say about how the property uses electricity, the more useful the first answer will be.

Optional.

Town or area is enough at this stage.

Optional. A rough figure in kWh or euros per month is useful, but not required.

How is the property used?
What stage is the property at?
What are you interested in?

Select everything that applies.

Preferred contact method

Roof type and orientation, current energy use, planned changes, anything that helps us understand the property.

This is a demo website. Please do not send electricity bills, contracts or other personal documents through this form.

Do not upload electricity bills or personal documents through this demo form. There is no upload field, and none is needed at this stage.

Useful to know

What makes an assessment request easy to answer.

When the property is busy

Whether power is drawn mostly in the middle of the day or mostly in the evening changes the design more than any other single fact.

What the roof looks like

Roughly which way it faces, whether it is flat or pitched, what it is covered with, and whether anything shades it.

What might change

A vehicle, a pool, an extension, a change of hours or a new tenant. All of it belongs in the design now rather than later.

Who else is involved

An architect, an electrician, a building manager or a landlord. Knowing early avoids designing around the wrong constraints.

Next step

Would rather just ask a question first?

The contact page is the shorter route, and there is no wrong order to do this in.